Dry Cleaner

Former dry-cleaning site PCE treatment

Former dry-cleaning facility, Durham, North Carolina

Durham, North Carolina, USA

Background

A former dry-cleaning facility contaminated soil and groundwater through prolonged tetrachloroethylene (PCE) emissions.

Technology used

Biochemical reductive treatment combined with permeable reactive barrier (PRB) technology

Approach

A single-head pneumatic TMA 350 grouting system delivered chemical slurry injections, progressing from pilot testing to full-scale implementation.

Measured data
MeasureValue
pilot: CVOC / PCE removal97% / >99%
full-scale: CVOC / PCE removal99.3% / 98.4%

Contaminants

Tetrachloroethylene (PCE), CVOCs

Results

  • Pilot phase (9 months): total CVOCs reduced from 2,540 µg/L to 71.2 µg/L (97% removal); PCE reduced from 2,400 µg/L to 6.2 µg/L (>99% removal)
  • Full-scale phase (16 months): 98.4% PCE removal, 99.3% total CVOC removal
  • Seven of eight monitoring wells reached near-background contaminant levels, with neutral pH and no toxic metabolic by-products